Proposed design targetLow risk§ fabrication

SFA Conversion Budget and Parts Planning

Editable, honest BOM. Categories are seeded — prices are yours to fill in as you get real quotes.

What we deliberately don’t do

We do not populate this worksheet with fabricated market prices. Used-axle, gears, and steel pricing move constantly and vary by region. A pretend-precise total gives false confidence.

Hidden costs to plan for

  • Engineering review or inspection fee.
  • Alignment (may require a shop equipped for solid axles).
  • Driveshaft balancing and rebuild.
  • Proportioning valve or brake-line rework.
  • Insurance re-rating.
  • Downtime cost — a work vehicle off the road has a real business cost.
  • Contingency (10–20% minimum).

§ Interactive · Budget / BOM

SFA Budget & Parts Worksheet

Category rows are seeded — fill in real quotes as you get them. No market prices are pre-populated.

CategoryItemQtyUnitCurSubtotal
Donor axle—
Axle rebuild—
Gears / locker—
Springs / hangers—
Steering—
Brakes—
Transfer case—
Driveshafts—
Crossmembers—
Wheels / tires—
Shocks / bump stops—
Steel / fasteners—
Wiring—
Fluids—
Consumables—
Engineering / inspection—
Alignment—
Professional labor—
Contingency—
Totals (currency-separated; no FX conversion applied)
—
Hidden costs commonly missed: engineering review, alignment, brake proportioning valve, hydraulic assist, driveshaft rebalance, insurance re-rating, and 10–20% contingency for the unexpected.