Commissioning, Shakedown, and Long-Term Inspection
Commissioning, shakedown, and long-term inspection intervals for an SFA conversion.
Pre-start inspection
- Torque marks (paint stripe across nut & bolt) on all major fasteners.
- Fluid levels — front differential, transfer case, transmission, engine, power steering, brakes.
- Brake system bleed complete; pedal firm; no leaks.
- Steering: no bind through full lock, both directions, engine off then engine on.
Static & low-speed
- Static steering test at idle — feel for hydraulic groan, listen for pump distress.
- Slow forward/reverse on a smooth private surface. Listen for clunks; watch mirrors for driveline shudder.
- Controlled brake application — even, straight, no pull.
Stop-work · Any fault → return to shop
Alignment
- Caster to target, camber near zero, toe set to spec.
- Alignment on a rack designed to work with solid axles when possible.
Re-torque schedule
These are conservative starting intervals — always follow component-manufacturer specs where they exist.
- U-bolts: re-torque after the first drive, then at 50 km, 500 km, and every 5,000 km.
- Track bar and steering fasteners: re-torque at 50 km, 500 km, then at each service.
- Wheel lugs: re-torque at 100 km and after any wheel removal.
Progressive validation
- Parking-lot laps → residential streets → arterial → highway.
- After each phase: inspect welds, fasteners, brake hoses, driveshaft joints, and fluid levels.
- 500 km and 1,000 km inspections logged in the Reference Build journal.
- Only after a clean 500+ km road period: easy-trail testing, with inspection after.
Long-term inspection
- Weld inspection: visual after every trail trip; NDT at intervals recommended by your inspector.
- Steering joints (drag link, tie rod, box, pitman arm) checked at every oil change.
- Wheel bearings — service interval affected by tire mass, use, and water intrusion.
What we know
- • U-bolts commonly settle after initial load and require re-torque.
Proposed design targets
- • Program plans a graduated shakedown from parking-lot to easy-trail testing.
Must be verified before fabrication
- • Component-specific torque values — reference component manufacturer specs once parts are selected.
Related SFA articles
§ brakes
Front Brakes, Hydraulic Balance, ABS, and Legal Safety
Donor calipers, master/booster capacity, proportioning, ABS/WSS, and jurisdiction implications for disabling systems.
Open
§ fabrication
Complete SFA Conversion Build Sequence
Gated phases from requirements through trail validation. Each phase has prerequisites, stop-work rules, and a persistent checklist.
Open
§ reference
Project Atlas SFA: Darren's 2005 Astro 2WD Reference Build
Living, planning-stage project journal. Baseline, objectives, open decisions, measurements pending, and decision log.
Open